Information provided here is for downtown only,
for city wide updates, please see
www.keepportlandmoving.org
Map of downtown construction sites.
(Last updated November 24th, 2008)
(Click on link to view location on map.)
Building Construction On Private Property and Related Street Use
 |
A: NW Lovejoy, Marshall,12th, 13th: thru early 2009 |
| Construction of a 16 story apartment building. Contractor is permitted sidewalk, parking closures around the site and intermittent lane closures on Marshall and on 12th. Full closure (pedestrain access maintianed) of NW 13th btwn Lovejoy and Northrup permitted for staging. |
| |
| Contractor: |
Andersen Construction for Evergreen Development |
| |
| Contact: |
Thomas Graves; 503.227.4040 |
| |
| top |
 |
B: SW Broadway & Park / Columbia to Jefferson; thru Feb 2009 |
| Ladd 1300 Park Ave Apartments is under construction. This is a 23 story building with 4 levels of underground parking, ground floor retail mixed use. Construction requires all sidewalks and parking around site to be closed. Continuous lane closure on west sidew of SW Broadway and intermittent use of lanes on Jefferson and Columbia. Intermittent street closures on Park Ave. |
| |
| Contractor: |
Opus NW |
| |
| Contact: |
Matt Easley; 503.793.7141 |
| |
| top |
 |
C: SW Washington / 12th to 13th; thru 2009 |
| Office and apartment tower under construction (5 levels underground and 22 levels above ground) requires sidewalk and parking removal on 12th / 13th half the block north of Washington and full block north side of Washington between 12th and 13th. Intermittent lane closures on Washington, 12th and 13th from 7am-3pm. |
| |
| Contractor: |
Hoffman Construction |
| |
| Contact: |
Greg Boersma, 503.221.8811 |
| |
| top |
 |
D: SW Washington / 4th-5th thru 11.20.08 |
| Remodel of old Caplan's Buidling to provide individual offices throughout the building. Requires sidewalk closure on south of Washington between 4th - 5th and parking removal on both sides of project. Sidewalk to be closed on east side of 5th between Washington and Alder on 01.02 through 01.10. Lane closure on south side of Washington permitted intermittently between 9am-3pm for unloading to site. Crane to be using the lane effective Jan 10th for 2 weeks. |
| |
| Contractor: |
R&H Construction |
| |
| Contact: |
Billy Morrison; 503.970.4820 |
| |
| top |
 |
E: SW 6th / Stark - Oak; through April 2009 |
| The 300 SW 6th Ave building is under complete remodel and an adjacent building on Stark between 5th and 6th has been demolished. In it's place will be the Courtyard Marriott Portland City. To facilitate construction, the sidewalks and parking are closed all hours on Stark and on Oak; the east sidewalk on 5th is partially closed but through pedestrian access is maintained. The south side lane on Oak is closed intermittently. |
| |
| Contact: |
Kelly Rowland, 503.221.8811 |
| |
| top |
 |
F: SW Main / Madison / 1st / 2nd; through 2009 |
| Office tower under construction on this full city block. Tower to be 3 levels underground and 17 levels above ground. To facilitate construction sidewalks and parking are closed around the site. Lane closures are permitted during non peak hours of 9am to 4pm on Main and on First; lane closures permitted during the hours of 7am-3pm on Madison and on Second. |
| |
| Contractor: |
Hoffman Construction |
| |
| Contact: |
Mark Parsons, 503.221.8811 |
| |
| top |
 |
G: SW 4th / Montgomery - Mill; through 2009 |
| Construction of The Cyan, a 16 story condo building, is underway at 1700 SW 4th Ave. The east sidewalk and parking is closed all hours and an intermittent lane closure is permitted from 9am-4pm adjacent to the job site. |
| |
| Contractor: |
Hoffman Construction |
| |
| Contact: |
Lou Parker, 503.793.0134 |
| |
| top |
 |
H: SW 5th / 6th & Harrison; through Sept 2009 |
| Consruction of PSU building is underway -- 6 levels with basement. To facilitate construction sidewalks and parking are closed around the site. Intermittent lane closures are permitted during non peak hours. |
| |
| Contractor: |
Skanska |
| |
| Contact: |
Jason Koski, 503.707.5348 |
| |
| top |
 |
J: SW Broadway / Taylor - Yamhill; 07.08.08 - Feb. 2009 |
| Sidewalk closure for building improvements on the east side of Broadway between Taylor and Yamhill, south end of block. The project also closes the east side sidewalk on Broadway 75ft north of Taylor, and the north side of Taylor 50ft east of Broadway. Parking removal shall be in place all hours. These closures are in effect from 07.08.08 through Feb. 2009. |
| |
| Contractor: |
Howard S. Wright Construction |
| |
| Contact: |
Jamie Shaw, 503.866.4906 |
| |
| top |
 |
K: NW Park / 9th / Flanders / Glisan; 07.22.08 - July 2009 |
| Parking and sidewalk closures on the west side of Park Ave between Flanders and Glisan, and on the north side of Flanders between Park and 9th for renovation at 411 NW Park Ave. Closures are valid all hours / all days. |
| |
| Contractor: |
Fortis Construction |
| |
| Contact: |
Pat Kehoe, 503.459.4477 |
| |
| top |
 |
L: SW Taylor / 6th - Broadway; 07.07.08 - February 2009 |
| North sidewalk closed on SW Taylor between 6th & Broadway, closest to Broadway, and east sidewalk closed on Broadway between Taylor & Yamhill with all parking removed for building remodel. |
| |
| Contractor: |
Howard S. Wright Construction |
| |
| Contact: |
Ivan, 503.220.0895 |
| |
| top |
 |
Q: SW Oak - Stark / 5th Ave - 6th Ave; 09.05.08 - 03.05.09 |
| Sidewalk closures and intermittent lane closure on SW Oak between 5th & 6th and on SW Stark between 5th & 6th, for construction operations from 09.05.08-03.05.09, between 7am-4pm. |
| |
| Contractor: |
Hoffman Construction |
| |
| Contact: |
Kelly Rowland, 503.274.5408 |
| |
| top |
 |
S: SW Park / 9th / Taylor / Yamhill; 07.01.08 - 12.29.08 |
| Sidewalk and parking closures surrounding Park Block 5: SW Park, 9th, Taylor and Yamhill. Lane closure on the north side of SW Taylor between Park and 9th. This area is fenced off for construction all hours/all days. |
| |
| Contractor: |
Brant Construction |
| |
| Contact: |
Mike Shaw, 360.737.1844 |
| |
| top |
 |
T: NW 19th / Hoyt / Glisan; 07.13.08 - 01.12.09 |
| Blockface parking and sidewalk closures surrounding NW 19th, Hoyt and Glisan, as well as a lane closure on NW 19th between Hoyt & Glisan. Closures are for construction operations at 510 NW 19th Ave, and are valid all hours/all days. |
| |
| Contractor: |
OPUS NW |
| |
| Contact: |
Brian Lasswell, 503.519.4715 |
| |
| top |
 |
U: NW Lovejoy / Marshall / 14th / 15th; 10.06.08 thru Spring 2010 |
| Parking and sidewalk are closed and fenced off surrounding the block of NW 14th, 15th, Lovejoy & Marshall, all hours/all days. Intermittent street closures on NW 15th between Lovejoy & Marshall between 7am-4pm for construction operations at 1035 NW 14th Ave. |
| |
| Contractor: |
Yorke & Curtis Construction |
| |
| Contact: |
Andrew Pierson, 971.404.4829 |
| |
| top |
 |
V: NW Glisan / 3rd Ave - 4th Ave; 07.15.08 - 01.12.09 |
| Construction work at 321 NW Glisan St will close the sidewalk and travel lane on the north side of NW Glisan between 3rd & 4th, and the sidewalk on the east side of NW 4th between Glisan & Hoyt until 01.12.09, all hours/all days. |
| |
| Contractor: |
J.B.H. |
| |
| Contact: |
Mick, 971.533.6781 |
| |
| top |
 |
W: NW Flanders St / 9th Ave - Park Ave; 10.21.08 - 01.19.09 |
| Sidewalk closure on north side of NW Flanders between 9th & Park and the west sidewalk on NW Park between Flanders & Glisan from 10.21.08-01.19.09, all hours, during construction at 411 NW Park Ave. |
| |
| Contractor: |
Fortis Construction |
| |
| Contact: |
Pat Kehoe, 503.459.4477 |
| |
| top |
 |
Z: NW Flanders / 14th Ave - 15th Ave; 11.17.08 - 02.15.09 |
| Blockface sidewalk and lane closure on the south side of NW Flanders between 14th & 15th for construction at 1417 NW Everett. A minimum 4 FT pedestrian passagway will be maintained. Also, blockface sidewalk and lane closure on the east side of NW 15th between Everett & Flanders. Effective all hours/all days. |
| |
| Contractor: |
Skanska Construction |
| |
| Contact: |
Brett McCoy, 503.572.4216 |
| |
| top |
 |
AC: SW Oak St / 3rd Ave - 4th Ave; 12.02.08 |
| Sidewalk closure on the north side of SW Oak between 3rd & 4th on 12.02.08, between 7am-Noon, for construction operations at 333 SW Oak St. |
| |
| Contractor: |
Walsh Construction |
| |
| Contact: |
Brad Croy, 503.519.4673 |
| |
| top |
 |
SW 9th Ave / Alder - Morrison; 11.26.08 |
| Street closure of SW 9th Ave between Alder - Morrison on 11.26.08 between 6am-9am for construction operations. |
| |
| Contractor: |
Lease Crutcher Lewis |
| |
| Contact: |
Tim Carpenter, 503-223-0500 |
| |
| top |
 |
NW 15th/Northrup/14th; through 12.31.08 |
| Close E/S sidewalk on NW 15th btwn Marshall - Northrup, S/S Sidewalk on NW Northrup btwn 14th - 15th, and close W/S sidewalk on NW 14th btwn Marshall - Northrup during construction at 1123 NW 14th Ave. |
| |
| Contractor: |
Skanska USA |
| |
| Contact: |
Chris Hartson, 503-209-1329 |
| |
| top |
Underground Utility Work and Street Excavation
 |
AG: SW Salmon St / 4th Ave - 5th Ave; 11.13.08 - 11.21.08 |
| Utility work on both sides of SW Salmon between 4th & 5th may require intermittent lane closures. Police and Disabled Parking zones on the south side of this block are relocated one block east on the south side of Salmon between 3rd & 4th, closest to 4th, during excavation 11.17.08-11.21.08. |
| |
| Contractor: |
Moore Excavation |
| |
| Contact: |
Scott, 503.849.0078 |
| |
| top |
Building Demolition
Street Maintenance
 |
None Scheduled |
Crane Work
 |
AP: SW Oak St / 5th Ave - 6th Ave; 11.23.08 - 11.26.08 |
| Lane closure on south side of SW Oak St between 5th & 6th for crane operations. A 12ft wide lane will remain open on the north side of the street. Times of operation are from 6am 11.23.08 to 4pm 11.26.08. |
| |
| Contractor: |
Campbell Crane & Rigging |
| |
| Contact: |
John Mitcham, 503.283.3111 |
| |
| top |
 |
AQ: SW College St / 5th Ave - 6th Ave; 11.22.08 |
| Street closure and sidewalk closure on the north side of SW College between 5th & 6th for crane lift operations on 11.22.08, between 6AM-7PM. |
| |
| Contractor: |
Campbell Crane & Rigging |
| |
| Contact: |
Bill Chapman, 503.260.4583 |
| |
| top |
 |
AR: NW Irving St / 13th Ave - 14th Ave; 11.21.08 |
| Street closure on NW Irving between 13th & 14th on 11.21.08, between 8AM-5PM, for crane lift operations. An 11-ft wide lane will remain open at all times. |
| |
| Contractor: |
Campbell Crane & Rigging |
| |
| Contact: |
Bill Chapman, 503.260.4583 |
| |
| top |
 |
NW Flanders St / 9th - Park; 11.25.08-11.26.08 |
| Close the street on NW Flanders btwn 9th Ave- Park Ave for crane operations from 6am-4pm. |
| |
| Contractor: |
Campbell Crane & Rigging |
| |
| Contact: |
John Mitcham, 503-260-5144 |
| |
| top |
Special Events
 |
AS: NW 3rd Ave / NW Couch / W Burnside / NW 4th; 11.27.08 |
| Street closures on NW 3rd between Couch & Burnside, and NW Couch between 3rd & 4th, on 09.27.08 and 11.27.08, between 6am-6pm, for community event: "Operation Overcoat" and "Love Your Neighbor Day." Maintaining one bus lane on NW 3rd and one traffic lane on NW Couch. |
| |
| Contractor: |
Union Gospel Mission, Cheryl White, 503.274.4483 |
| |
| top |
Multnomah County Bridge Work
|
 |